Tuesday, June 10, 2014

On the third day...

Our third day in Mexico was our second day of work. There was a lot of concrete to be mixed and poured for the support columns and the floor of the bedrooms behind the community center that are being built for the Auburn interns. In all, the two teams mixed a total of 10,000 pounds, or five metric tons, of concrete. Before this concrete could be poured, however, four stumps had to be removed from the floor area and subsequently filled with a mixture of rocks and sand called "tuscumbro." These stumps were partially growing into the rocks that surrounded them, which exponentially increased their resistance to our efforts. After they were removed it was pretty smooth sailing at the construction site. 
At the kid's club today, we had a lesson based on John 6:47-48. The arts and crafts project that the children took part in today was a plastic plates with the bible verse inscribed on them and colored strips of paper glued to it. Overall, it was a very satisfying day, both physically and spiritually.

-John Browning and Josef Straughn

No comments:

Post a Comment